Common Area Specifications
Structure
Earth Quake Resistant, RCC Framed structure designed for Seismic Zone-3
Flooring
Vitrified tiles flooring
Common Toilets
Flooring & Walls
- Vitrified / Ceramic Tiles
Sanitaryware
- Vitreous Ceramic Sanitaryware
Exterior Elevation
Combination of External Grade Texture Paint alongwith Stone/ Aluminum Composite Panel Cladding/Jali
Power Backup
Power Back up as required shall be provided in common area. Monthly recurring charges for common area power back up shall be borne proportionately by all the allottee.
Escalator
Ground Floor to First, Second & Third Floor
- An escalator shall be provided for upward movement from Ground Floor to Third Floor
Lifts
- 1 No. lift shall be provided for Ground Floor to Third Floor movement.
- 2 No. lift shall be provided from Basement Floor to Top Floor movement.
- 1 No. lift shall be provided for the movement of goods & service personal from Basement Floor to the Top Floor.
Unit Area Specifications for Ground, 1st , 2nd, & 3rd Floor
Flooring
Bare Concrete Floor
Walls
Plain Cement Plaster
Shop Entrance
Rolling shutter with designated space for signage on the top
Airconditioning
(provisioning for placing split air-conditioning outdoor unit only)
- Location for placing 2 no. Outdoor Unit of 2 Ton (max.) shall be provided.
- AC Unit shall have to be provided and installed at designated location by Allottee at his own cost.
Height
Floor Slab to Floor Slab height shall be 3800 mm.
Power Backup # (DG Power)
5 KW Power Backup provision shall be given at extra cost. Monthly recurring charges towards operation of Power Backup shall be charged extra.
Grid Power #
Provision for 6 KW Electrical load shall be made in each unit. Electrical Load sanction, Supply and Meter Connection Charges shall be charged extra.
Electrical Point
Provision for Single point electrical connection upto the distribution board only shall be made. Electrification inside the unit shall be done by the allottee at his own cost.
Water / Drainage & Sewage
Provision for water supply point, drainage shall be given in the shaft attached with the unit.
Unit Area Specifications for 4th, 5th & 6th Floor
Flooring
Bare Concrete Floor
Walls
Plain Cement Plaster
Entrance
Flush Door Shutter
Airconditioning
(provisioning for placing split air-conditioning outdoor unit only)
- Location for placing 2 no. Outdoor Unit of 2 Ton (max.) shall be provided.
- AC Unit shall have to be provided and installed at designated location by Allottee at his own cost.
Height
Floor Slab to Floor Slab height shall be 3200 mm.
Power Backup # (DG Power)
3 KW Power Backup provision shall be provided at extra cost. Monthly recurring charges towards operation of Power Backup shall be charged extra.
Grid Power #
Provision for 5 KW Electrical load shall be made in each unit. Electrical Load sanction, Supply and Meter Connection Charges shall be charged extra.
Electrical Point
Provision for Single point electrical connection upto the distribution board only shall be made. Electrification inside the unit shall be done by the allottee at his own cost.
Water / Drainage & Sewage
Provision for a water supply point, drainage shall be given in the shaft attached with the unit.
#
Based on suitable diversity factor as allowed by State Electricity Regulations.